Analisis Efisiensi Produktivitas Menggunakan Metode Overall Equipment Effectiveness Pada Industri Manufaktur Automotive Components di PT Kawasan Industri Modern Cikande Serang
Keywords:
Productivity Efficiency, Overall Equipment Effectiveness, Automotive Components, Six Big Losses, AvailabilityAbstract
Production machine efficiency has become a crucial factor in determining competitiveness of automotive component manufacturing industry amid increasingly intense global competition. This research aims to analyze the productivity efficiency level of production equipment using Overall Equipment Effectiveness method at PT Kawasan Industri Modern Cikande Serang. Research focus is directed on injection molding machine type IM-450 which has the largest output contribution in automotive component production process. Data collection was conducted over a three-month period through direct observation and documentation of company production records including machine operating time, downtime, minor stoppage frequency, and product quality data. OEE method is used to measure three main components namely availability, performance, and quality as indicators of production machine utilization effectiveness. Research results show OEE value of 73.40% consisting of availability 85.51%, performance 88.44%, and quality 97.00%. This value is still below world class standard of 85% with a gap reaching 11.60%. Six big losses analysis identifies breakdown losses as the largest contributor at 35.2%, followed by setup and adjustment losses 29.6%, and reduced speed losses 20.8%. Improvement recommendations include implementing structured preventive maintenance, standardizing setup procedures using SMED method, intensive operator training, and applying stricter quality control to achieve optimal productivity improvement.
Keywords: Productivity Efficiency, Overall Equipment Effectiveness, Automotive Components, Six Big Losses, Availability
Abstrak
Efisiensi produktivitas mesin produksi menjadi faktor krusial dalam menentukan daya saing industri manufaktur komponen otomotif di tengah persaingan global yang semakin ketat. Penelitian ini bertujuan untuk menganalisis tingkat efisiensi produktivitas peralatan produksi menggunakan metode Overall Equipment Effectiveness di PT Kawasan Industri Modern Cikande Serang. Fokus penelitian diarahkan pada mesin injection molding tipe IM-450 yang memiliki kontribusi output terbesar dalam proses produksi komponen otomotif. Pengumpulan data dilakukan selama periode tiga bulan melalui observasi langsung dan dokumentasi catatan produksi perusahaan yang mencakup waktu operasi mesin, downtime, frekuensi minor stoppage, dan data kualitas produk. Metode OEE digunakan untuk mengukur tiga komponen utama yaitu availability, performance, dan quality sebagai indikator efektivitas penggunaan mesin produksi. Hasil penelitian menunjukkan nilai OEE sebesar 73,40% yang terdiri dari availability 85,51%, performance 88,44%, dan quality 97,00%. Nilai tersebut masih berada di bawah standar world class sebesar 85% dengan gap mencapai 11,60%. Analisis six big losses mengidentifikasi breakdown losses sebagai kontributor terbesar dengan 35,2%, diikuti setup and adjustment losses 29,6%, dan reduced speed losses 20,8%. Rekomendasi perbaikan mencakup implementasi preventive maintenance terstruktur, standardisasi prosedur setup menggunakan metode SMED, pelatihan intensif operator, serta penerapan quality control yang lebih ketat untuk mencapai peningkatan produktivitas optimal.
Kata kunci: Efisiensi Produktivitas, Overall Equipment Effectiveness, Komponen Otomotif, Six Big Losses, Availability.
Downloads
References
Alamri, T. O., & Mo, J. (2023). Optimisation of Preventive Maintenance Regime Based on Failure Mode System Modelling Considering Reliability. Arabian Journal for Science and Engineering, 48(3), 3455–3477. https://doi.org/10.1007/s13369-022-07174-w
Alkhosi, F., Sinaga, Z., Widyantoro, M., Industri, J. T., Teknik, F., Bhayangkara, U., Raya, J., & Losses, S. B. (2024). Analisis Efektivitas Mesin Tamaki OP 4 Menggunakan Overall Equipment Effectiveness (OEE) Dan Six Big Losses (Studi Kasus: PT BMC). Prosiding Semnastek FT-UBJ, 1(1), 1–20.
Aryanti, F. I., Santoso, T. B., Christian, F. P., & Putra, D. A. (2023). Implementasi Total Productive Maintenance (TPM) dalam Penerapan Overall Equipment Effectiveness (OEE) di PT. XYZ. Journal of Community Services in Sustainability, 1(1), 1–8. https://doi.org/10.52330/jocss.v1i1.135
Asgara, B. Y., & Hartono, G. (2024). Analisis Efektifitas Mesin Overhead Crane Dengan Metode Overall Equipment Effectiveness (OEE) Di PT. BTU, Divisi Boarding Bridge. 15(1), 62–70.
Ashidiqi, M. A., Hanafi, M., & Mulyono, N. B. (2023). Journal of Business and Management Studies Determinants of Employee Retention in Pharmaceutical Companies: Case of Saudi Arabia. Journal of Business and Management Studies (JBMS), 2709–0876, 8–22. https://doi.org/10.32996/jbms
Attaqwa, Y., Hamidiyah, A., & Ekoanindyo, F. A. (2021). Product Quality Control Analysis with Statistical Process Control (SPC) Method in Weaving Section (Case Study PT.I). International Journal of Computer and Information System (IJCIS), 2(3), 86–92. https://doi.org/10.29040/ijcis.v2i3.43
Hakim, I. M., Singgih, M. L., & Gunarta, I. K. (2023). Identifying Critical Success Factors for Implementation of Internet of Things (IoT) in Indonesian Automotive Companies. ACM International Conference Proceeding Series, 55–61. https://doi.org/10.1145/3603955.3603965
Hossain, M. N., Rahman, M. M., & Ramasamy, D. (2024). Artificial Intelligence-Driven Vehicle Fault Diagnosis to Revolutionize Automotive Maintenance: A Review. CMES - Computer Modeling in Engineering and Sciences, 141(2), 951–996. https://doi.org/10.32604/cmes.2024.056022
Ihsan Hadi Nugroho, Xander Salahudin, & Fuad Hilmy. (2025). Optimasi Produktivitas Mesin Microfeed melalui Pendekatan Overall Equipment Effectiveness (OEE): Studi Kasus di Industri Manufaktur. Jurnal Teknologi Dan Manajemen Industri Terapan, 4(I), 63–68. https://doi.org/10.55826/jtmit.v4ii.542
Jarašūnienė, A., Čižiūnienė, K., & Čereška, A. (2023). Research on Impact of IoT on Warehouse Management. Sensors, 23(4). https://doi.org/10.3390/s23042213
Jawad, Z. N., & Balázs, V. (2024). Machine learning-driven optimization of enterprise resource planning (ERP) systems: a comprehensive review. Beni-Suef University Journal of Basic and Applied Sciences, 13(1). https://doi.org/10.1186/s43088-023-00460-y
Jayanti, I. N., & Nurkertamanda, D. (2025). Analisis Efektivitas Mesin Nagao 75 T (A5) Melalui Penerapan TPM Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Six Big Losses Pada PT Bimuda Karya Teknik. Industrial Engineering Online Jurnal, 14(3).
Judijanto, L., Tahir, A., Sunardi, S., Muthmainah, H. N., & Syamsuddin, A. (2024). The Development of Internet of Things (IoT) Technology in the Manufacturing Industry in Indonesia A Literature Review on Implementation and Impact on Operational Efficiency. Sciences Du Nord Nature Science and Technology, 1(01), 01–06. https://doi.org/10.71238/snst.v1i1.11
Karim, M. R. (2025). Optimizing Maintenance Strategies in Smart Manufacturing: a Systematic Review of Lean Practices, Total Productive Maintenance (Tpm), and Digital Reliability. Review of Applied Science and Technology, 04(02), 176–206. https://doi.org/10.63125/np7nnf78
Katili, E., Samad, A., & Qurnaini, K. (2023). Perhitungan efektivitas kinerja Excavator menggunakan metode Overall Equipment Effectiveness ( OEE ) pada kegiatan penambangan limestone PT. Topabiring Trans Logistik Kabupaten Pangkep. Prosiding Seminar Nasional Teknologi Industri, 78–83.
Mashabai, I., Ramdani, M. D., Ulfaturrahmi, & Hermanto, K. (2025). Analisis Pengukuran Overall Equipment Effectiveness (OEE) Mesin Rice Milling Unit di CV Fajar Samudra. Metode Jurnal Teknik Industri, 11(October 2023), 161–170.
Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Productivity Press. https://books.google.co.id/books?id=XKc28H3JeUUC
Novendria, R. D., & Hartini, S. (2024). Analisis Six Big Losses Untuk Meningkatkan Nilai Overall Equipment Effectiveness (OEE) Pada Mesin Press 350t Di Perusahaan Otomotif.
Nur, M., & Hidayat, M. I. hidayat. (2017). Analisis Nilai Overall Equipment Effectiveness Pada Mesin Packer Di PT. Semen Padang Unit Produksi Dan Pengantongan Dumai. Jurnal Teknik Industri, vol 3, no., 110–115.
Panudju, A. A. T. (2025). Peningkatan Efektifitas Mesin dengan Metode Overall Equipment Effectiveness. RIGGS: Journal of Artificial Intelligence and Digital Business, 4(1), 428–436. https://doi.org/10.31004/riggs.v4i1.423
Prasetio, E. T., & Oktora, A. (2024). Evaluation of The Effectiveness of Die Casting Machines Using Overall Equipment Effectiveness (OEE). Jurnal Teknologi Dan Manajemen, 22(1), 99–106. https://doi.org/10.52330/jtm.v22i1.239
Rangel, M., Urbina, J., Carrera, J., Guirette, O., Murillo, V., Celaya, J., Durán, H., & Cruz, O. (2024). Enhancing Scrap Reduction in Electric Motor Manufacturing for the Automotive Industry: A Case Study Using the PDCA (Plan–Do–Check–Act) Approach. Applied Sciences (Switzerland), 14(7), 2999. https://www.scopus.com/record/display.uri?eid=2-s2.0-85192532984&origin=resultslist&sort=plf-f&src=s&sid=010a4a57479abff16b53d9a3b2c36601&sot=b&sdt=cl&cluster=scosubtype%2C%22ar%22%2Ct%2Bscofreetoread%2C%22all%22%2Ct&s=TITLE-ABS-KEY%28Advantages+or+benefi
Setyawan, W., Sutoni, A., Munandar, T., & Mujiarto. (2021). Calculation and Analysis of Overall Equipment Effektiveness (OEE) Method and Six Big Losses toward the Production of Corter Manchines in Oni Jaya Motor. Journal of Physics: Conference Series, 1764(1). https://doi.org/10.1088/1742-6596/1764/1/012162
Su, J., Wei, Y., Wang, S., & Liu, Q. (2023). The impact of digital transformation on the total factor productivity of heavily polluting enterprises. Scientific Reports, 13(1), 1–21. https://doi.org/10.1038/s41598-023-33553-w
Sugiyono. (2020). Metodologi Penelitian Kuantitatif, Kualitatif dan R & D.
Tumanggor, O. S. P., Wismantoro, S., Agung, K., & Hamonangan, P. (2024). Analisis Mendalam Efektivitas Mesin CNC Menggunakan Metode OEE dan Six Big Losses di PT. ABC. Sainstech: Jurnal Penelitian Dan Pengkajian Sains Dan Teknologi, 34(4), 70–79. https://doi.org/10.37277/stch.v34i4.2273
Wahyuanto, E. (2025). Effective Strategies in Production Management To Improve Operational Efficiency. MSJ : Majority Science Journal, 3(2), 211–219. https://doi.org/10.61942/msj.v3i2.376
Wibowo, P. A., & Padilah, I. (2023). Analisis Overall Equipment Effectiveness (OEE) dan Six Big Losses Pada Mesin Length Adjusment Line 3 Departemen Belt Assy PT XYZ. G-Tech: Jurnal Teknologi Terapan, 7(2), 439–449. https://doi.org/10.33379/gtech.v7i2.2236
Wijaya, Y., Hartanti, L. P. S., & Mulyono, J. (2022). Pengukuran Kinerja Mesin Cetak Menggunakan Metode Overall Equipment Effectiveness Untuk Mengurangi Six Big Losses. Jurnal Tekno Insentif, 16(1), 38–53. https://doi.org/10.36787/jti.v16i1.578
Downloads
-
PDF FULL TEXT
Abstract Dilihat : 28 Kali , Download: 19 Kali
Published
Issue
Section
License
Copyright (c) 2025 Gilang Agusti, Budiharjo (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.